Engineers of record
Install to your design. Hand you the record.
We coordinate pile layout, install to your stop criteria, and return torque logs with an as-built plan. Example formats below; every job gets its own logs and as-built.
Field documentation
Torque logsRecorded while each pile rotates, for your correlation. Not a substitute for design.
ASTM A123Hot-dip galvanizing for coastal exposure unless you specify otherwise.
As-builtLayout, depths, deviations, and photos packaged for closeout.
Sample formats
Downloadable examples for discussion with your team. Project logs and as-builts are written per job.

What the design still settles
Axial, uplift, and lateral demand. Soil and groundwater. Scour. Corrosion protection. Plumb or battered. Termination into concrete, steel, or wood. We install. You remain engineer of record.
Ask for the current product evaluation report for the shaft specified on the job. Report numbers are not listed on this site. Email [email protected] to coordinate.